Basic Description
Outfitted together with the zero leak bidirectional checking sole-noid valves, this power unit is designed to the operation of two independent circuits. Which are respectively to the key and subordinate platforms from the double scissors lift. Two cut-off valves are made use of for reducing the machine manually in situation of energy loss. If additional independent circuits are demanded to your application please get in touch with us for availability.
Remark: 1. Please seek the advice of our revenue engineer for your different pump displacement, motor electrical power or tank capacity.
two. CSA or UL certified motors can be found upon request.
Unique Notes
1. The AC motor is of S3 duty cycle, which can only operate intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean the many hydraulic elements concerned just before installation of the energy unit.
3. Viscosity from the oil shoud be 15~46 cst,along with the oil really should be clean and free of charge of impurities,N46 hydraulic oil is advised.
4. The electrical power unit must be mounted vertically.
five. Check the oil level within the tank just after the preliminary running of the energy unit.
6. Oil altering is required soon after the first a hundred operation hours,afterwards the moment just about every 3000 hrs.