DUMP TRAILER Electrical power UNIT-DOUBLE ACTING
Standard Description
This electrical power unit includes a energy up energy down circuit with load holding on each A & B ports. A stress compensatred movement control may be additional to circuit to manage the decent speed from the cylinder.
Particular Notes
one. This energy unit is of S3 duty cycle, i.e., non-continuous operation, 30 seconds on and 270 seconds off.
two. Clean all of the hydraulic components concerned ahead of installation of the energy unit.
three. Viscosity in the hydraulic oil shoud be 15~46 cst, which need to also be clean and absolutely free of impurities. N46 hydraulic oil is encouraged.
4. The energy unit should be mounted horizontally.
5. Check the oil degree from the tank after the first working on the power unit.
6. Oil transforming is required soon after the preliminary a hundred operation hrs, afterwards the moment every single 3000 hrs.

DUMP TRAILER Electrical power UNIT- SINGLE ACTING
Standard Description
This power unit features a electrical power up gravity down circuit. Get started the motor to lengthen the cylinder and activate the solenoid valve to retract the circuit. Manual override to solenoid valve might be supplied if demanded. Also a pressure compen sated movement management can be added to the circuit to manage the descent pace on the cylinder.
Remark: Please check with our product sales engineer for your diverse pump displacement, motor electrical power or tank capability.
Specific Notes
1. This electrical power unit is of S3 duty cycle, i.e., non-continuous operation, thirty seconds on and 270 seconds off.
two. Clean each of the hydraulic parts concerned just before installation of the power unit.
three. Viscosity on the hydraulic oil shoud be 15~46 cst,which should really also be clean and absolutely free of impurities.N46 hydraulic oil is advisable.
four. The power unit really should be mounted horizontally.
five. Check the oil level inside the tank just after the initial operating of your power unit.
six. Oil altering is needed just after the first one hundred operation hrs, afterwards the moment just about every 3000 hours.